OCPP Charge Point GFX Certification Testing

Smart Charging GFX Certification Testing

Process Description


Figure 1. Process Overview

Currently, we are testing for the 1.6  protocol. The implementation of version 2.0.1 is underway. To request a Smart Charging integration test, you need to first check whether this charger has already been certified for OCPP or not. If it is not certified then you will have to schedule an OCPP Integration test and pass before scheduling a Smart Charging Test. This is a requirement to make sure that the charger passes the "core" functionality of OCPP before we can test for Smart Charging. For further information on scheduling an OCPP integration test please follow this link that explains the process: 
OCPP Charge Point GFX Certification Testing (greenflux.com)

To schedule a Smart Charging Integration Test, either the Customer Success Manager (CSM) or clients can create a Zohodesk ticket on our Support Portal. Ultimately, if your charger also needs an OCPP Integration test, you only need 1 ticket where you mention all the tests that you want to conduct as shown below in "Type of Testing".


The OCPP integration form can be found using this link and selecting "Submit a Ticket on the bottom left":

The ticket or email should include the following information:
- Manufacturer
- Charge station model (if a specific firmware version needs to be tested, please specify it)
- Manufacturer contact details (provided by our customer)
- Type of test (OCPP Basic, Smart Charging)

The process follows the same logic as the OCPP Integration. The process flow is shown in Figure 1. above.
    • Related Articles

    • OCPP Charge Point GFX Certification Testing

      Process Description Figure 1. Process Overview 1. Intake - Requesting a New Test Currently, we are testing for the OCPP 1.6 and 1.5 JSON protocol based on clients' requests. To request an OCPP integration test, both the Customer Success Manager (CSM) ...
    • Eichrecht GFX Certification Testing

      Process Description Figure 1. Process Overview Currently, we are testing for the 1.6 protocol. The implementation of version 2.0.1 is underway. To request an Eichrecht integration test, you need to first check whether this charger has already been ...
    • How is Charge Station, Connector and EVSE status determined?

      Charge Station Status Charge station status comes from the OCPP StatusNotification message where connectorId = 0, as per OCPP this is the charger level status. This is then mapped from OCPP to OCPI. EVSE Status EVSE status is derived from the ...
    • Customer Journey with Greenflux: Buying and Integrating New Chargers

      Certification Process When a client decides to purchase a charging station, they can request Greenflux to perform an OCPP certification test.  During the technical integration, our team contacts the manufacturers and provides them with a test script ...
    • Certified Charge Stations

      The GreenFlux platform is hardware-agnostic and compatible with all charge stations enabled with  OCPP 1.5 and 1.6 JSON protocol. GreenFlux performs integration testing between charge station (hardware and firmware) and platform at three functional ...